... settlement crater 沉陷坑 settlement of fill 填方沉降 settlement of foundation 地基沉降 ...
基于6个网页-相关网页
rate of fill settlement 充填材料沉缩率
Thus, wetting settlement and displacement can not neglected when the ground of high fill is soaked.
因此,对高填方体地基,浸水产生的湿化沉降和位移不容忽视。
The creep curves were obtained by using regression and iteration analysis method, which make it possible to calculate the settlement after construction of high fill with viscoelastic parameters.
运用回归搜索迭代方法所得的蠕变规律为考虑材料粘弹性的高填方工后沉降计算提供了各项参数。
By analyzing and discussing settlement after construction of fillings in the article, it is show that stone is prior to soil to fill high embankment.
本文对填筑体的工后沉降进行了较为深入的分析探讨,验证了高填方填筑体应优先采用石料的结论。
应用推荐