Trickling water frequently occurs in the outside appearance of biconnected arch tunnels after the secondary lining, influencing their construction quality and operating.
在双连拱隧道施工中,二次衬砌完成后表面往往会出现渗漏水现象,对双连拱隧道施工质量及营运造成影响。
In the mountain tunnel construction, the secondary lining concrete crack is a certain universal quality problem.
在山岭隧道施工中,二次衬砌混凝土裂缝成为带有一定普遍性的质量问题。
The paper adopts field test method and numerical simulation method to analyze the reliability of secondary lining during the construction and long term usage of the tunnel.
本文采用现场试验和数值模拟分析相结合的方法,对高速公路隧道在施工期间及运营期间长期阶段支护结构的安全性、可靠性进行了分析。
应用推荐