The engineering layout of its second stage has a close relationship with sedimentation.
二期工程的取、排水口布置,与该区域的淤积关系甚大。
Presents integrated management of engineering construction and production preparation of the second stage chemical fertilizer project of Fudao chemical co., as well as the execution efficacy.
介绍中海石油化学有限公司二期化肥项目工程建设和生产准备一体化的各项管理工作及实施成效。
应用推荐