feasible schemes optimization 可研方案优选
optimization schemes 优化方案
optimization of process schemes 工艺方案优化
Optimization of blasting schemes 爆破方案优选
optimization of development schemes 开发方式优选
optimization of dehydration schemes 方案优化
Optimization Schemes of Land-use Structure 土地利用结构优化方案
Then the candidates for the first few weeks are fed to the second step for subsequent weekly refuelling schemes optimization. At the second step, weekly refuelling schemes optimization model is developed based on the Linear Sensitivity Matrix (LSM) method.
第二阶段基于线性敏感矩阵(LSM)方法建立起周换料方案优化模型。
参考来源 - CANDU堆换料优化方法研究及直接优化方法在压水堆堆芯换料中的可行性研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐