Through the analysis and comparison of the results. Reasonable construction scheme is selected.
分析比较计算成果,选出合理的施工方案。
After comparison and analysis, a UV detection scheme and a system structure is given.
经比较分析提出了一种紫外探测方案,给出了一种系统结构。
Based on the analysis of EVA target, brings forward the transverse comparison of salary incentive scheme.
基于EVA指标分析的基础上,提出了横向比较的薪酬激励设计方案。
应用推荐