Even thoughclosely spacedparallelapproachesincrease the throughputcapacity, an optimaltaxiwaylayoutisnecessarytominimize gate-runwaytimeandreduceincursions.
Two options for new building close to the existing one would see a full-length runwayparallel to the existing one and 385 metres, or alternatively 1, 035 metres, south of it.