润扬大桥(Run-Yang Bridge)北汊桥
基于8个网页-相关网页
Time management experience of Runyang Bridge is systematically summarized, of which advantage and disadvantage also being analyzed.
对在建的润扬大桥项目进度管理进行了系统总结,分析指出其先进与不足之处。
·2,447,543篇论文数据,部分数据来源于NoteExpress
After optimizing the mix proportion and simulation of a big specimen in locale, NVC admixture applies well in Run-Yang bridge on the Yangtse River.
经过自密实混凝土配合比优化设计和现场试块模拟试验后,NVC自流平外加剂成功应用于润扬大长江公路大桥北锚碇。
youdao
应用推荐
模块上移
模块下移
不移动