The Spring Road bridge Replacement Project in Central Pennsylvania replaced a deteriorating 188-foot steel plate bridge, originally constructed in 1930.
宾夕法尼亚州中部的斯普林路大桥更换项目取代了最初在1930年建成,日益恶化的188英尺长钢板桥。
But FAO's emergency project has funds for shoring up the bridge foundations and upgrading the track that runs from the main road.
然而,粮农组织的紧急项目为加固桥梁基础和改造通往主要道路的路面提供了资金。
In the project of bridge, lots of time was cost by the building of road on both sides.
立交桥工程中,两侧路面的修筑花费了大部分的时间。
应用推荐