HDD is often the preferred method for constructing the pipeline across such obstacles as streams or wetlands. (See inset diagram.) Here is shown a typical river crossing.
水平定向钻孔(HDD)常常是管道穿越河流或湿地这类障碍优先选用的方法。插图表示河流穿越的典型情况。
West Pipeline crossing Heihe River is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench.
黑河是西部管道工程采用大开挖方式穿越的距离最长的河流, 原油与成品油管道采用同沟敷设方式穿越该河流。