This paper deals with resource scheduling and capability analysis problems of satellite-ground station system.
研究卫星—地面站系统资源调度和能力分析问题。
In order to support the analysis and optimization of the enterprise process automation in a wide scope, an activity-based resource capability modeling method was introduced.
为了支持更广范围的过程自动化分析与优化,提出了一种基于活动的资源能力建模方法。
Method of analysis includes the use of strategic and analytical tools such as SWOT, Porter's Five Force Framework, Resource Audit, Capability and Stakeholder Analyses.
分析方法包括战略的使用和分析工具例如SWOT,波特的五种力量框架,资源审计,能力和利益相关者的分析。
应用推荐