According to the requirement of the tools test parameter and craft test parameter, have done the design and analysis for the subsystem parts.
根据工具、工艺试验参数要求,完成了该试验井各组成系统零部件的设计分析。
It mainly involves requirement gathering, document management, user interface analysis and the use of requirement management tools.
主要涉及需求前期的获取、文档管理、用户界面分析以及需求管理工具的使用等方面。
At the requirement analysis step, confirms the requiring degree of automated test and prepares the tools and environment for automated test.
在需求分析阶段确定了远程游戏系统的自动化测试需求程度,自动化测试工具和自动化测试环境。
应用推荐