The orderer must then be prepared to respond to a request (callback, in this case) to process the final invoice.
订货方然后必须响应一个请求(在本例中是回叫)来处理最终的货物。
The PDP creation and request evaluation process is described in detail after Listing 6.
PDP 创建和请求评估的详细过程将在 清单 6 后介绍。
In this process, if a request arrives in paper form, a person with the role "Receiving" needs to enter the data from the form into a system.
在此流程中,如果到达纸质形式的请求,角色为“接收”的人员需要将表单中的数据输入系统。
应用推荐