That, Mr Birol says, "could push back the peak of production, as it would take longer to produce the lower-cost oil that remains to be developed."
比罗尔表示,这“将延迟石油产量峰值到达的时间,并将有待开发的低成本石油的生产周期拉长。”
Remains of the many monuments, unique human landscape, tourist resources to be developed.
古迹遗存众多,人文景观独特,旅游资源有待开发。
But there remains a transformation to be developed, which converts the surface seismic data into VSP.
然而目前还欠缺一种变换—从地面地震资料换算成VSP,即所谓的拟VSP法。
应用推荐