After implementation, initial production of oil Wells has risen 83.4% on the average, and production decline rate is reduced greatly.
措施实施后油井初产平均提高83.4%,且产量递减率大大降低。
It is shown that, compared with the results from traditional BP neural network, the average error rate is reduced by 1% and the convergence speed raised by 3 times.
结果表明,小波神经网络方法比传统BP网络方法平均预测误差减小了1%,收敛速度加快了3倍。
The application results indicated that the water supply cost was saved 20%, leakage rate was reduced from 28% to 8% comparing with average values of the 5 years before the operation.
应用结果表明,与投运前五年平均值相比,供水成本节约了20%,漏损率从原来的28%降到8%。
应用推荐