...】钢或混凝土支撑;质量预控;质量问题;防治措施 [gap=408]Key words】Steel or concrete support;The quality of pre-control;Quality;Control measures ...
基于16个网页-相关网页
Pre-control means the control of the project preparation stage, mid-control is the control of the construction process, after control means after the end of the project quality control.
事前控制是指对工程准备阶段的控制,事中控制是指对工程施工过程的控制,事后控制是指工程结束后质量的控制。
This paper introduce the many kinds of thread joint pre-tightening up force control method and against loose measure, elaborates the solution thread joint quality method.
文章介绍了多种螺纹联接的预紧力控制方法和防松措施,从多方面针对性的阐述了解决螺纹联接质量的方法。
The construction plan, process flow, construction method, pre control of jacking quality and matters need attention are elaborated in detail.
并对其施工方案、工艺流程、施工方法、顶进质量的预控和安全注意事项作了详细的阐述。
应用推荐