This paper is based on seepage reinforcement project of Erwangzhuang reservoir. Model test, analysis of finite element and analysis of the prototype observed data are made to study impervious effect of the project.
本研究以某水库防渗加固工程为背景,主要进行了模型试验、有限元分析以及实测数据分析,对加固工程的防渗效果进行了研究。
参考来源 - 土坝防渗加固模型试验研究与数值分析·2,447,543篇论文数据,部分数据来源于NoteExpress
The genetic analysis for system error and lourse error of the prototype observed data of earth-rock dam is carried out.
对土石坝原型观测资料的系统误差、粗差的成因进行了分析;
Therefore, it is very important that using even mature theory and method analyzing and evaluating the condition of leak and deformation, according to prototype observed data of earth-rock dam.
因而,根据土石坝原型观测资料,运用更成熟的理论和方法,对土石坝渗漏、变形等性态做出科学分析及评价,就显得极为重要了。
Some problems about the ice model test are also discussed by comparison with the observed data from the prototype.
同时对照了原型观测成果,讨论了冰凌运动模型试验中的一些问题。