For the design of desilting basin, the reasonable operation and prototype observation design should be offered according to the river sediment situation and pivot operation condition.
沉沙池设计应根据河流泥沙情况及枢纽运行条件,提出合理的运行设计和原型观测设计。
Both water pressure test and prototype observation proved that the design meets the normal operation requirements of the hydropower station.
通过水压试验及原型观测试验验证了设计符合客观要求,能满足电站正常运行的要求。
The choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper.
本文就坝址选择及枢纽工程布置、混凝土面板堆石坝设计、施工和原型观测等方面进行了全面的论述。
应用推荐