It is inevitable for length projection deformation processing in mine GPS control data transacting.
在矿区GPS控制网数据后处理过程中,对长度投影变形的处理不可回避。
Therefore, some necessary restricted measures should be taken to make the projection length (deformation) less than 1/40 000 in order to meet the requirement of accuracy for railway surveying.
针对这一问题,必须采取有效的约束条件和措施,使得长度变形小于1/40 000,从而满足铁路测量精度要求。
应用推荐