Throughout the project, every individual, including the system test team members, was learning how to size the design, development, and test tasks per iteration.
在项目过程中,每个人,包括系统测试团队成员,都了解如何估量每个迭代的设计、开发,和测试任务。
The reality is that there are many forces at work in organizations that lie beyond the project team delivering the system, and these need to be accounted for.
现实往往是这样的:团队经常会强迫项目小组在规定时间交付系统,这需要构架师正确的评估到这个时间。
The Lifecycle architecture milestone establishes a managed baseline for the architecture of the system and enables the project team to scale during the Construction phase.
生命周期体系架构里程碑为系统的体系架构建立了一个受控的基线,并令项目团队在构构建段进行测量。
应用推荐