海心沙工程进度款的管控方法-建筑经济 关键词] 工程进度款,工程特殊性,管控方法 [gap=318]Key words: project schedule fund; project particularity; manage and control method
基于1个网页-相关网页
The particularity of project and organization should be integrated in the research on project organization variation.
工程项目组织变迁的研究须结合工程项目及其组织的特殊性。
The particularity of engineering construction has determined that the contract of insurance of quality responsibility of the project is differ from the ordinary contract of insurance in many aspects.
工程建设的特殊性决定了工程质量责任保险合同在很多方面不同于普通的保险合同。
This project is underground civil air defense. Owing to particularity of the project, waterproof player of the project is adopted structural self? Waterproof adding flexible waterproof measure.
本工程为地下人防工程,由于工程的特殊性,工程防水层采用结构自防水加柔性防水两道措施。
应用推荐