With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.
将项目全寿命周期中影响现金流的建设阶段和运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型。
The DBO project delivery approach is considered to optimize project life-cycle costs and improve the efficiency of operation of facilities.
DBO模式被认为具有优化项目全生命周期费用,提高设施运营效率的作用。
The practice shows that, for the project, as an effective method for acquisition fundamental information in early time, this technique has shortened the operation cycle, and has saved the cost.
实践证明此项技术作为获取项目前期基础信息的有效手段,作业周期短、成本经济且现势性好,其成果兼具客观性和直观性,可有效辅助项目后续工作的实施。
应用推荐