The project crate is not intended to contain information already maintained in the configuration management (CM) and control system.
项目栅格中不包含已经在配置管理(配置管理,CM)中维护的信息,并控制系统。
The system, advanced in design, practical and complete in function, can provide complete information about rain, water and project operation to support flood control decision.
该系统设计先进,功能齐全实用,为防洪指挥决策人员和管理人员提供了雨、水、工情的全面信息支持以及洪水调度的决策支持。
This thesis is based on the development of our enterprise's project expense control management information system.
本文是在参加开发本企业项目费用控制管理信息系统的基础上完成。
应用推荐