go top

project calculation basis

网络释义

  项目计算依据

项目计算依据Project Calculation Basis 总体开发成本估算Overall Development Cost Estimates ..

基于1个网页-相关网页

有道翻译

project calculation basis

工程计算依据

以上为机器翻译结果,长、整句建议使用 人工翻译

双语例句

  • On the basis of analysing storm flood characteristics of Qinjiang River, the method and main results of design flood calculation for Gaobazhou Project are presented.

    分析清江暴雨洪水特性基础上,介绍了高坝洲水利枢纽设计洪水计算方法及其主要成果

    youdao

  • On the basis of the presentation of components of communication project installation fee, the calculation and selection methods of each fee are analyzed.

    详细介绍通信建设建筑安装工程费构成基础上分析了各项费用计算取定方法

    youdao

  • On basis of the underground passage project between south and north square of Changchun Station, the dewatering calculation method for interferential well group in weak aquifer is presented.

    含水层干扰降水计算时,不能按各单井等涌水量考虑,且不一定所有井都对计算点水位降深产生干扰。

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定