Production engineering measure planning is different from development planning. It is aimed at optimizing measures workload and selecting candidate wells.
采油工程措施规划与开发规划不同,它是以优化措施工作量和优选候选井为目的。
Optimizing continuous casting planning is one of the important ways to get high production rate and reduce the energy consuming.
编制高效的连铸生产计划在提高生产率和降低能耗方面具有十分重要的意义。
应用推荐