... predicted impact point预示的弹着点 production implementation program生产执行规划 programmed interconnection process程序互连工艺过程 ...
基于1个网页-相关网页
Production of the crop is rebounding after having sharply dropped during implementation of the land reform program over the past decade.
在过去十年中执行土地改革项目导致烟叶产量急剧下降之后,该国的烟叶产量正在反弹回升。
With Numbers: "Improved production 19% and reduced assembly-line downtime from 7 to 1.5 hours per week through implementation of preventive-maintenance program."
使用数字:“提高了产量的19%,通过实施预防性维修将生产线每周的停工期由7小时降低到了1.5小时。”
应用推荐