The horizontal frost-heaving force is attenuated in the process of excavation with the maximum attenuation rate being 40 percent.
并给出了随着基坑开挖的卸压作用,桩上受到的水平冻胀力呈现减小趋势,最大衰减率达40%。
The whole process of excavation, construction and operation in a project can be simulated well with simulating computation in which the supplied parameters are used.
提供的参数用于仿真计算能很好地模拟整个工程从开挖、施工到正常运行的全过程。
The author analyzes various factors on the stability of the process of excavation, such as different excavation height, different diameter, embedded depth, different spacing.
分析了不同开挖高度,不同桩径、不同嵌入深度、不同桩距等因素对挖过程中稳定性的影响。
应用推荐