The ability to have ultimate control over the design process means that they can ensure that the strategic objectives are achieved or at least maintained.
拥有设计流程的最终控制权意味着可以确保战略目标得以实现,或是至少维持进度。
The automated build process means that changes committed into a remote version-control repository will be downloaded and executed on your build server with no human intervention.
自动构建过程意味着提交给远程版本控制仓库的变更会在没有人为干预的情况下,自动下载到构建服务器并在上面执行。
Presents the principle of statistics process control, the judgement of state in statistical control for a process by means of control chart, and the analyses and improves process capability.
阐述统计过程控制的原理、应用控制图对过程作出统计稳态的判断,分析并提高过程能力。
应用推荐