New kind of gas-solidfast separatorwith highseparatingefficiency, shortgasresidenttime, lowpressureloss and long life is urgently needed to couple with concurrent downerreactor.
Eight of the more than 9, 700 tubes in one of the unit 3 generators failed a pressure test, while six tubes in unit 2's reactorneeded to be plugged, the NRC has found.