... prediction protection ==> 予测保护 prediction scale ==> 速度预测尺 prediction theory ==> 预报理论 ...
基于10个网页-相关网页
scale prediction 规模预测
multi-scale prediction 多尺度预测
earthquake scale prediction 震级预测
dynamic multi-scale prediction 动态变尺度预测
meso-scale numerical prediction 中尺度数值预报
prediction of the protection scale 保有量预测
meso-scale numerical prediction model 中尺度数值预报模式
multi-scale dynamic prediction system 多尺度动态预测系统
MM5 meso-scale numerical prediction model MM5中尺度数值模式
It was indicated that the range of effective prediction scale can be expanded from 5 min to 2 min. The result of research is shown that the approach based on fraction will be ineffective within 2 min.
在此基础上,又对分性的预测尺度进行了进一步探讨,在所选取交通流样本地段,研究表明有效预测尺度范围下限可由5min扩大到2min,但在2min以下分形方法已失效。
参考来源 - 基于分形理论的短时交通流预测研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The result above shows that it is significant to apply the multi-fractal characteristic in mid-strong earthquake prediction of one year to one and half year scale in this area.
上述结果说明利用地震时序的多标度分形特征对于该地区的半年至一年尺度的中强地震预报是有意义的。
The comprehensive information system for mineral resources prediction is a quantitive prediction aptitude GIS of large scale mineral resources targets, which is suitable for the crisis mines.
综合信息矿产预测系统是一个可用于大比例尺矿产靶区定量预测的智能化地理信息系统,因而应用在危机矿山上更有实效。
The integrative assessment of mineral resources is a dynamic and synthetic one in a global scale, with the functions of prediction and diagnosis.
矿产资源集成评价是一种动态的、全球性的综合评价,具有预测、诊断功能。
应用推荐