The result indicates that pre vibration during forming columns and the drainage action of columns is available for the earthquake resistance of foundation.
结果表明:在碎石桩成桩过程中,对土层的预振作用、桩体的排水作用,将有利于土层的抗震。
The outburst risk index and gas gush feature are analysed during roadway progress. The result proves that the effectiveness of zonal gas pre-drainage by cross-measure boreholes.
消突效果检验后进行煤巷掘进,掘进期间通过对突出危险性指标和瓦斯涌出参数的分析,验证穿层钻孔区域预抽瓦斯消突技术的有效性;
应用推荐