An structure analysis in columnar power house of Extension Project of Dahua hydropower station is made by 3d element program and considering three different water levels.
对大化水电站扩建工程的圆筒式厂房,在3种不同水位下,通过三维有限元程序,进行了结构分析,结果表明圆筒结构合理。
This paper explains the role and function of intelligent transformer terminal unit in electric power system, introduces the wain content and design program of the project.
阐述了配电变压器监测终端在配电自动化系统中的作用与功能;介绍了“电力系统配电变压器智能监测终端设备”课题研究的主要内容及设计方案。
Planning selection of sand stocking yard and the aggregate processing program are important parts in the planning and the construction of hydraulics and electric power project.
砂石料场的规划选择和骨料加工方案是水电工程施工组织设计中的重要环节。
应用推荐