Power Grid project with the characteristics and the risks related to circumvent The theoretical knowledge of the power grid project tender countermeasures for avoiding risk to be taken analysis.
结合电网工程项目的特点和风险规避的相关理论知识,对电网工程项目投标风险的规避对策进行分析。
参考来源 - 电网工程项目投标风险分析与对策研究·2,447,543篇论文数据,部分数据来源于NoteExpress
But in the construction and management of power grid project, the malpractice of high construction cost doesn't change due to the monopoly system.
但在电网项目建设管理中,因垄断体制造成建造成本居高不下的弊端仍然存在。
It stresses the foundations, measures, contents of power grid project processing plan, while drawing construction plans, as well as the tips and major problems in management practice.
并且列举了计划的实际成果。本文着重论述了电网建设项目进度计划的编制依据、方法、内容以及在实际管理中需要特别注意的问题。
The project is designed to generate around 30 megawatts of power for the national grid.
该工程规划为国家电网发电约3千万瓦。