The quadratic programming method is used to solve the short-term power generation scheduling problem under the condition of electricity market and considering the ramp constraints of generating sets.
文中以二次规划算法解决了电力市场环境下考虑爬坡约束的短期发电计划的制定问题。
Load dispatch is the main problem of short-term generation scheduling in power market.
负荷分配是编制短期发电计划所面临的主要问题。
The generation scheduling, network loss allocation and congestion dispatch are main contents in spot power transactions.
发电计划的制定、网损分摊以及阻塞调度是实时电力交易的主要内容。
应用推荐