...狀况简述 依据核四厂终期安全分析报告(FSAR)及起动管理手册(SAM) 规定,初始测试分为:施工后测试(post construction test, PCT)、试 运转测试(preoperational test)及起动测试(startup test)等三阶...
基于4个网页-相关网页
This paper introduces the construction and test techniques for prestressed and post-tensioned negative moment.
介绍了预应力后张法负弯矩的施工与检测技术。
Combined with practical work the construction technology of post-grouting bored pile is introduced and discussed from test pile, construction procedure, pile foundation test and other aspects.
介绍了后压浆钻孔灌注桩的施工工艺,结合工程实例,从试桩、成桩工艺、桩基检测等方面进行了论述,指出后压浆钻孔灌注桩工艺具有承载力高、工程造价低的特。