The fifth chapter studied the key shaft, linking brace and pole base of experiment platform, using the finite element analyzing software, providing the intension checking and structure optimizing.
第五章,利用有限元分析软件对实验台的关键件主轴、曲柄联接柱及长杆固定座进行有限元分析,并进行了强度校核和结构优化。
Clean the machine including the surface, base, slip board, groove, pressed board and oriented pole in the fixed time. (turn off the power until the machine to normal temperature).
定期清洁机台表面、底板及下模滑板、沟槽、上模内压板及保险杆(注:必须关闭电源并恢复常温)。
The pole columns of the circuit-breaker are each mounted on a base 11, to the side of each of which an operating mechanism cubicle 15.1 is fitted.
断路器的每相极柱分别安装在基架11上,每个基架旁边都有一个操作机构箱15.1。
应用推荐