The plinth foundation excavation work was divided by two stages the first one was ordinary excavation, the second one was rock excavation.
趾板基础开挖分两期进行,一期为一般开挖,二期为岩石开挖。
The geological boreholes, exploratory adits and fault crushed zone in the plinth foundation area must be disposed before plinth concrete construction.
在趾板混凝土施工前必须对趾板区基础的地质钻孔、探硐、断层破碎带等进行处理。
The large plinth of thick raft foundation refers to the raft foundation which links several separate architectural units above the ground as a whole by extended substructure.
大底盘厚筏基础是通过扩大的地下结构,将地面上不同建筑单元连成一体的筏板基础。
应用推荐