Site schedule control is an important link of whole project control, and platform fabrication is a critical activity of Pinghu oil and gas field development project.
报告。 平湖油气田工程现场进度控制是整个项目控制过程中的一个重要环节,平台建造是整个平湖油气田项目的关键活动之一。
In order to reduce platform fabrication period and achieve early start-up, both pre-drilling and platform drilling methods are adopted in developing Pinghu oil & gas field.
为了缩短平台建设周期,使之早日投产,平湖油气田采用了预钻井和平台钻井相结合的方式。