The control function must be accomplished manually during plant startup until the plant is at a load level that is in the operating range of the automatic controls.
电厂在开机时直到电厂达到自动控制工作范围的负荷水平前,控制功能须手动完成。
In view of the poor operating efficiency that is lower than design level of computer network in Handan Cogeneration Power Plant, the renewing design scheme of the network is optimized and modified.
针对邯郸热电厂网络系统实际运行效率低于设计水平的问题,进行了网络系统优化的设计方案调整。
The accident state, the sequence of tripping operation of switch and the interval of time could be recorded at real-time. The level of operating management of large power plant could be increased.
实时记录事故状态、开关跳闸顺序及间隔时间,提高了大型发电厂的运行管理水平。
应用推荐