In view of the poor operating efficiency that is lower than design level of computer network in Handan Cogeneration Power Plant, the renewing design scheme of the network is optimized and modified.
针对邯郸热电厂网络系统实际运行效率低于设计水平的问题,进行了网络系统优化的设计方案调整。
It focuses on the design and application of network structure of MIS with plant floor equipments in their level of automatic control and computer processing.
其中重点研究了MIS系统与底层设备基础自动化级、过程级的网络结构设计与实现。
应用推荐