According to the requirement for reconstruction of wastewater treatment plant, the design capacity, design criteria, and reconstruction scheme were discussed, and some Suggestions were presented.
针对污水厂的改造要求,对污水厂改造中的设计规模、设计标准和改造方案等进行了探讨,并提出了建议。
Research results have been used in construction of commercial plant as a design basis for increasing dissolution capacity and recovery and simplifying surface production process.
所获参数已作为大厂建设的设计依据,可以提高溶矿能力,提高资源回收率,简化地面生产工艺。
The results show the water diversion system can satisfy the requirement of specification and design after the power plant capacity enlargement.
结果表明,电站增容后引水系统完全能满足有关规范和设计的要求。
应用推荐