Consider having layers of analysis if you plan to reuse aspects of your system model in future projects.
如果你计划在将来的项目中重用你的系统模型的某些部分,考虑对分析模型进行分层。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
The structure form, calculating model, loads and boundary condition, structure analysis and member section choice are introduced. Superiority of the used plan is demonstrated at last.
就结构选型、计算模型、荷载与边界条件的选取、结构分析与截面选择等方面进行了介绍,并对结构方案的优越性进行了论证。
应用推荐