Using this technology can save working times of crane and reduce workers to pipe well with centralized arrangement pipe and electric engineering with narrow working platform.
采用该工艺对于管道集中布置的管井及现场施工作业面狭窄的高层建筑的机电工程施工,可节省塔吊作业时间并减少现场作业人员数量。
The mechanical analysis of operating the high temperature high pressure deep well testing pipe string is one of the key techniques in testing engineering design.
高温高压深井测试管柱的工作力学分析是测试工程设计的关键技术之一。
Based on a foundation treatment project, karst cave grouting, jet grouting pile and steel pipe pile as well as their applications in actual engineering project were presented.
据此,详细介绍灌浆技术在岩溶地区处理涌水溶洞时的具体应用,这对于其他类型的堵漏及地基加固项目也可提供一定的参考。
应用推荐