When laying pipelines under road, railway, river and other obstructions, conventional drenched pipe burying method is hard in construction.
在公路、铁路、河流及其它障碍物下敷设地下管道时,采用常规的挖沟埋管法施工难度较大。
For determining working parameters during the pipe-laying operation with a lay-barge, the laying method and other working situation of the pipeline must be analyzed.
为了确定用铺管船法铺设海洋管道过程中的作业参数,必须对海洋管道的铺设方式和作业状态进行分析。
应用推荐