non pillar sublevel caving 无底柱分段崩落
non-pillar sublevel caving 无底柱分段崩落
pillar sublevel caving mining 有底柱分段崩落法
non-pillar sublevel caving method 无底柱分段崩落采矿法
non pillar sublevel caving method 无底柱分段崩落法
Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.
采用无底柱分段崩落采矿法,国内外一直采用截止品位放矿法来控制出矿。
Because of anciently usually adopting empirical method to determine the structure parameter of non pillar sublevel caving, there are hard to guarantee parameter optimize.
由于无底柱分段崩落法结构参数一直采用经验方法确定,很难保证结构参数最佳,本文分析了放出体和矿石堆体的形态及其影响因素。
Deficient floor slope Angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.
采用沿脉布置的无底柱分段崩落法,当矿体底板倾角不足时,需要在下盘岩石中开掘进路。