The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice.
本文结合工程实践,通过现场试验分析研究提出锚杆桩抗拔极限荷载直接或间接的确定方法,并提出了合理的施工方案。
Based on the load tests carried out in soft soil foundation treatment project of an expressway under construction, the effective cement-soil mixing pile length in composite foundation was explored.
本文根据某高速公路软基处理中不同桩长的水泥土搅拌桩单桩载荷试验结果,探讨了复合地基中水泥土搅拌桩的有效桩长。
The relations between uplifting load , displacement and time were simulated numerically and compared with the results of actual pile tests, and the ultimate uplifting bearing capacity was defined.
数值模拟了上拔荷载、桩上拔位移与时步的关系,并与宏观物理实物试验的实测结果作了对比分析;
应用推荐