go top

pile-driving

  • 打桩

网络释义专业释义

  打桩剧烈颠簸

... pile-driver打桩船 pile-driving打桩剧烈颠簸 pile-extractor拔桩机 ...

基于40个网页-相关网页

短语

pile driving 锤入桩

pile driving barge [船] [水利] 打桩船 ; 打桩驳船

pile driving hammer 打桩锤 ; 桩锤

pile driving equipment 打桩设备

pile driving boat [船] [水利] 打桩船

dynamic pile driving test 动力测桩

pile driving formula 打桩公式 ; 打公式

pile driving pontoon 打桩船

pile driving frame 打桩架

 更多收起网络短语
  • 打桩剧烈颠簸

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句

  • The equipment is suitable for various underwater projects and can also be used as pile-driving ship, geology survey ship, charge ship for mud extrusion by explosion, drilling ship, and etc.

    设备作为打桩地质勘探船、爆破装药船、钻孔船等使用适用多种水下基础施工工程

    youdao

  • Pile driving speed, the average 3 minutes can realize piling 6 meters deep, namely a hole three minutes to play.

    打桩速度快平均3分钟实现打桩63分钟一个

    youdao

  • The method of dynamical measurement which was applied to analysis of pile driving is extended to test and measurement on the stiffness and strength of vertical joints between diaphragm walls.

    用于桩基检测推广应用于地下连续纵向接缝刚性强度测试

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定