By simulating analysis, the optimal parameters, Numbers and type of construction machinery can be obtained, and the smallest cost and shortest period of construction projects can be predicted.
通过仿真分析,可以对施工机械的机型、数量以及作业参数作出最佳选择,并且预测出施工的最短工期和最低施工费用。
The intension of integrate plan of engineering cost and construction period is analyzed based on earning value method.
] 以挣值管理方法为研究内容,分析工程造价与施工工期集成计划的内涵。
Project cost in construction enterprises is to reflect the engineering construction enterprise cost level in a certain period of time, is the combination of various factors.
施工企业的工程造价是在一定时期内反映出施工企业工程建设的费用水平,是诸多因素结合的产物。
应用推荐