The port tugboat operation scheduling is a kind of parallel machines scheduling problem with special process constraint.
港口的拖轮调度过程是一类带特殊工艺约束的并行多机调度问题。
The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).
考虑并行批加工机上不同尺寸工件的调度问题;目标是极小化最大完工时间。
The problem of scheduling jobs with chain precedence constraints on identical parallel machines is discussed in this article.
所描述的问题为在平行机台上调度具有单一模具约束的成组工作,以实现最小化总拖期量为目标。
应用推荐