Problems concerned with the optimum design, precision estimation and control point positioning of the control network in construction survey of a power plant are introduced.
文中介绍某电厂施工测量中有关控制网的优化设计、精度估计及控制点位放样方法等问题。
The method of multi-objective programming used in this paper can be applied to other sort of optimum design for practical survey engineering and their accuracy analysis.
本文提出的理论和方法亦可推广应用于一般测量工程的精度分析和优化设计中。
应用推荐