Optimization of load assignment is one of the major approaches to the optimal operation of industrial boiler plants.
工业锅炉房负荷分配的最优化是达到其优化运行的最主要的途径之一。
The method is introduced to develop mathematical model of gas turbine, centrifugal compressor and gas transmission pipeline needed for load assignment optimization.
介绍了建立优化调度所需的燃气轮机、离心压缩机和输气管线模型的方法。
应用推荐